| |

|

|
 |
|
 |
 |
 |
|
| 
|
 |
|
The
transformation of this space took less than six months from initial
research to completion. Cost of the total project was less than the
price of just the original lower curved cabinets. |
|
|
|
- PROJECT:
EDS Capabilities Demonstration space remodel
- CHALLENGE: To enhance function and flexibility
- SOLUTION: To remove non-functional components and introduce an aluminum
presentation matrix that can accommodate a variety of presentation components
and that can be easily changed
aaa
|